Transformative Project in Salford
In Partner with SEP New Job start C2 Salford to deliver 1000 new homes 2 new car parks, 800000 sq ft commercial space and new public spaces : Aseel C. E. Ltd will participated throughout the entire construction process by setting out for piling, ground works, RC structure, drainage, and final details. To ensure high quality of production, as-built surveys were updated as the construction progressed forward.


Blow Out Mitigation
Construction of Blow out mitigation works at CWM RHEIDOL, Aberystwyth Wales. We were engaged in management of site control, line, level, position, drainages, steel bar banding, steel drawing, checking design drawings, setting out for drainages, Jack pit foundation, Piles, earth work, Precast, Cast in anchors, Retaining & Toe walls, Marking grad line & datum etc, checking concrete quality, making site dairy, carrying out survey and making as built drawing, Measuring excavation, landscaping, and Earth work etc with EDM and calculate Quantity with the help of (Civil 3D), making QA spreadsheet in excel and PDF, control site documents in a good file system. Etc.